China Factory Holidays 2026–27: The Cutoff Dates Behind Every Made-to-Order Quote

Mid-Autumn Festival, Golden Week and Chinese New Year each stop production for days or weeks. The 2026–27 closure windows, the lead-time maths for made-to-order goods, and the approve-by dates that keep an in-hands date safe.

12oz stainless steel vacuum insulated tumbler, made to order

Almost everything on this site is made to order in China, and that is exactly why our landed prices work the way they do. It also means three dates on the Chinese calendar decide whether an in-hands date is realistic. Here are the 2026 and 2027 windows, the lead-time maths behind them, and the order-by dates to put in your own calendar.

The 2026–27 factory calendar at a glance

HolidayPublic holidayWhat factories actually doImpact on a live order
Mid-Autumn Festival25–27 Sep 2026Close 1–3 days; many roll straight into the National Day breakLow: proofs and replies slow for a few days
National Day (Golden Week)1–7 Oct 2026Close 7–10 days; nothing ships 1–8 OctMedium: add 10–14 days if production crosses 1 Oct
Chinese New Year6 Feb 2027Close 10 days before, reopen 8 days after: 27 Jan – 14 Feb 2027High: no new China-made deliveries from late Jan to mid-March

The public holiday is what the government publishes. The factory closure is what our suppliers tell us they will do, and it is always longer. Plan against the second column of dates, not the first.

How the lead-time maths works

A made-to-order item has three clocks running in sequence. Production only starts once you approve the free digital proof, and the freight clock only starts when the factory hands the cartons to the forwarder.

  • Proofing: 1–3 business days, mostly waiting on approval.
  • Production: the days listed on each product page, typically 7–20. A stainless tumbler runs about 15, a tote about 12, a metal pen about 10, an umbrella about 7.
  • Air freight and customs: 7–10 days door to door, duties and brokerage already in your landed price.

When a holiday sits inside any of those windows, the whole chain pauses. A factory that closes on 27 January does not finish a job on 28 January and hold it for you. It finishes it in the second half of February, after the returning workers clear the jobs that were already on the floor.

Order-by dates for Chinese New Year 2027

In-hands date you needApprove proof byNotes
On or before 26 Jan 202718 Dec 2026Standard production plus air; comfortable
Late January, rush8 Jan 2027Depends on the factory having capacity left; confirm before quoting your client
1 Feb – 20 Mar 202718 Dec 2026Must be produced before the shutdown. Nothing ordered in January lands in this window
Late March 2027 onwardAny time from mid-FebruaryFirst post-holiday production ships by air around 10–20 March
Sea freight after the holidayAny time from mid-FebruaryAdd 35–45 days on the water; expect late April arrivals

The pattern is simple. Everything confirmed before the December cutoff arrives before the seven-week gap. Everything confirmed after it arrives after the gap. There is no order date that lands in the middle.

The Golden Week version of the same rule

National Day is a smaller shutdown with the same shape. For an in-hands date in the second or third week of October, the job has to be finished and on a plane before 25 September. Proofs approved in the last week of September go into production on or after 8 October and land in the second half of the month. If a quote you are holding right now has a mid-October event on it, the answer is to approve today or move the date.

Three things that go wrong every year

  1. Proof approval drifts. The order is placed on 10 December, the proof sits over the holidays, and by 4 January the factory is already turning down pre-New-Year work. Approve before you leave for the break.
  2. Freight is booked late. The last two weeks before New Year are the busiest air-cargo period of the year. Space runs out and rates rise. Our landed price protects you from the rate, not from the space, so finished goods are booked the day they are ready.
  3. Post-holiday quality dips. A factory that lost a fifth of its workforce over the break is training new staff in late February. We inspect those early runs harder, and we tell you if a product is better ordered a little later.

What we do on our side

Give us the in-hands date at quote time, not at order time. We check it against the calendar above before we quote, tell you if it clears, and suggest a comparable product with a shorter production window if it does not. If a holiday moves an order after it has been confirmed, you hear from us before it happens, not after the tracking number goes quiet.

Chinese New Year moves every year because it follows the lunar calendar. It is 6 February in 2027 and 26 January in 2028, which pulls the 2028 shutdown into the middle of January. If you run a fixed February program, that is the year to order in November.

Products mentioned in this article

Frequently asked questions

When do Chinese factories close for Chinese New Year 2027?

Chinese New Year falls on 6 February 2027. Our factories close about ten days before it and reopen about eight days after, so plan on a shutdown from 27 January to 14 February 2027, with production returning to full capacity in late February or early March.

What is the last date to order for delivery before the 2027 shutdown?

For standard production and air freight, approve your proof by 18 December 2026. Rush orders may be possible until about 8 January 2027, but only if the factory still has capacity, so confirm before promising a date to your client.

Does the October Golden Week affect my order?

Yes, if the order is in production on 1 October. Factories close for seven to ten days and nothing ships from 1 to about 8 October, so add ten to fourteen days to the normal lead time. For a mid-October in-hands date the goods must ship before 25 September.

Does the Mid-Autumn Festival cause delays?

Only small ones. It is a three-day holiday, 25 to 27 September 2026, and costs a day or two of production. This year it sits just before Golden Week, so many factories run slowly from 25 September through 8 October.

Is the landed price affected by holiday freight rates?

No. The price you are quoted includes freight, duties and brokerage to one location in Canada or the United States, so a pre-holiday rate spike is our problem, not yours. What we cannot buy back is cargo space, which is why finished goods are booked the day they are ready.

Context: State Council of the People's Republic of China, public holiday arrangements for 2026: https://www.gov.cn/zhengce/ · Hong Kong Observatory, Gregorian-Lunar calendar conversion (Chinese New Year 2027 = 6 February 2027; 2028 = 26 January 2028): https://www.hko.gov.hk/en/gts/time/conversion.htm